News

SEC "ZTZ-Service"

Reactor installation project at Zaporizhzhya Substation NEC UKRENERGO

Created: 2021.11.06 Author: Анна Цема

At present, "ZTZ-SERVICE" R&D Center specialists are carrying out work on the installation and testing of three reactors ROM-110000/750 at the 750 kV Zaporozhskaya substation of the NEC "UKRENERGO" in the following scope:

1️⃣ Testing and installation of attachments on reactors:

  • control cabinets
  • cooling systems
  • high-voltage bushings 750 and 110 kV

2️⃣ The next stage of the project is testing the reactors after installation prior to commissioning.

R&D Center "ZTZ-SERVICE" has more than 60 years of experience in the installation and commissioning of transformer equipment. We have installed more than 5500 transformers with a capacity of 100 MVA.

Reactor installation project at Zaporizhzhya Substation NEC UKRENERGO

We use cookies to provide necessary website functionality, improve your experience and analyze our traffic. By using our website, you agree to our cookies usage.

Up